We visited this on the Saturday and below are pictures taken as we walked down through the empty locks to see this work being undertaken.
The queues waiting to go down the locks.

The canal upstream from the top of the locks.

The first of the locks viewed from above


The ladder to the top of the first lock showing the line where the water normally is and the green moss above

One of the new lock gates

A good view showing the depth of the locks themselves

The second of the new lock gates

The final lock at the end of the descent

Looking back at the crowds descending

Back up at the top of the locks with the view upstream on the Skipton side of the locks

No comments:
Post a Comment