Erection of The Chevin Cross

Sections taken from the Warehouse in Otley Chevin Cross 090411 001 Loading onto the wagon Chevin Cross 090411 002 First section being taken to the top of the Chevin Chevin Cross 090411 003 Second section going up the hill Chevin Cross 090411 004 Pieces going into position Chevin Cross 090411 005 Two sections slotted together Chevin Cross 090411 006 Top bolts going into place Chevin Cross 090411 007 Side bolts being put in Chevin Cross 090411 008 Keith tightening the bolts Chevin Cross 090411 009 Fred getting bolts ready for the cross piece Chevin Cross 090411 010 Cross piece being put into position Chevin Cross 090411 011 Cross piece being tightened Chevin Cross 090411 012 Cross ready for hauling upright Chevin Cross 090411 013 Guylines being tightened Chevin Cross 090411 014 Main line being fastened round the upright for security purposes Chevin Cross 090411 015 Thanksgiving prayers at the end of the task Chevin Cross 090411 016 The cross in position overlooking the Wharfe Valley Chevin Cross 090411 019